Timber-frame construction gives architects the freedom to design forward-looking projects in wood, from bespoke homes to modular houses, flats and offices. At Carpentier, we translate your design into a smart, efficient timber construction with attention to detailing, technical feasibility and a smooth execution on site.
Timber-frame construction offers everything modern builders are looking for: an energy-efficient home, a healthy indoor climate and endless architectural freedom. Thanks to the dry and fast building method, you save both time and gain comfort.
At Carpentier, we combine years of experience with innovative systems and circular thinking. In this way, we create not only sustainable homes, but true dream houses — stylish, efficient and ready for the future.
Much higher build speed than on a traditional building site. Within a few days you already have a wind- and watertight shell.
Less waste on site. Fewer building errors. No need for heavy foundation work.
Excellent thermal insulation and optimal air quality. With timber-frame construction, you save on your energy bill.
Every cubic metre of wood stores more than 1 tonne of CO₂. By choosing timber construction, you opt for a building method with a lower ecological impact and a sustainable material with a future.
1. Preparatory phase
Before execution begins, we work out the project together down to the last detail, from material choices to the position of sockets, switches and light points. Via our timber construction app, you quickly gain insight into the design, the technical development and the budget impact. This way, we create a smooth transition from design to execution.
2. Production phase
The timber-frame walls are produced with attention to detail in our workshop, using bio-based and circular materials. Thanks to our digital preparation and CNC-controlled production, all elements are worked out precisely and perfectly matched to one another. This way, we limit errors on site and the assembly runs efficiently. The dry building method also enables a quick connection of further finishing, which results in additional time savings.
3. Construction and finishing phase
The timber-frame walls are assembled in a short time into a wind- and watertight shell. Timber cladding can be installed immediately afterwards, with concealed fixing for a sleek and refined finish.
Watch the impression videos below of the high-quality build, both for timber-frame construction (right) and solid timber construction or CLT (left).
Is your client opting for a complete concept? Then we can also include a timber deck, wooden gate and/or fence in the same wood variety and style as part of the kit.